Intergrated Management

We build the value of the world with creative thinking and passion. We will be a sustainable management company that is loved by customers and respected by society.

Maximize customer satisfaction
through continuous innovation

DAEBO Engineering & Construction efficiently manages quality, environment and safety policies.
DAEBO Engineering & Construction has obtained international quality and environmental management system certifications (ISO9001 / 14001) and Occupational Health and Safety Assessment Series (OHSAS 18001) with KOSHA18001 (Korea Occupational Safety Health Agency). Since 2011 we have operated effective, integrated management of quality, environment, and safety/health policies.

Our quality policy

First,
Top quality realized by measurable objectives and regular assessment.
Second,
Maximized customer satisfaction by improved performance through continuous innovation.
  1. 01Top quality

  2. 02Environmentally
    -friendly construction

  3. 03Culture of voluntary
    safety control

  4. Zero accident

Maximize customer satisfaction
through continuous innovation

DAEBO Engineering & Construction practices environmental and safety management.
DAEBO Engineering & Construction practices environmental and safety management through organic cooperation among the CEO, project management division (including safety and environmental team and relevant business units), and a construction site. The environmental organization at the construction site is supervised by the site manager, who is the on-site environment-in-charge and promotes organic cooperation at the site.
The safety organization is composed of the site manager, who is the on-site safety/health-in-charge, safety manager who provides general instructions and advice, and safety supervisor who is in charge of managing/supervising safety and accident prevention.

On-site environmental
management system

Depending on the results of the periodic monitoring,
Corrective action is taken immediately in case of nonconformity.
When the construction site is prepared, design documents based on an environmental impact assessment and results of relevant discussions, are reviewed and analyzed in order to assess potential environmental impact and hazards caused by the project. Then, environmental management promotional plans for the site's environmental objectives, applicable to the site, are developed, and the on-site environment manager makes a checklist according to environmental inspection plans developed by the site manager. Later, regular monitoring is conducted to identify any non-conformance and to provide corrective measures.

Process of the on-site environment management

  1. 01Review of the
    site and design
    documents

  2. 02Environmental
    impact assessment

  3. 03Environmental
    objectives

  4. 04Environmental
    management
    promotional plans

  5. 05Monitoring
    and measurement

  6. 06Environmental
    inspection

On-site safety
control system

DAEBO Engineering & Construction is actively utilizing smart risk assessment system.
DAEBO Engineering & Construction has obtained OSHA18001/KOSHA18001 and promoted accident prevention activities systematically. In particular, KOSHA18001, which we obtained in November 2017, for the first time as a mid-sized constructor, is a system for eliminating hazards in advance through the cycle of Plan→Do→Check→Action. This system, together with our smart hazard assessment system, is a key element of our accident prevention efforts.

On-site safety control process

06367, 6th fl., Rosedale bldg., 280, Gwangpyeong-ro, Gangnam-gu, Seoul
Tel   (+82)02-3016-9000 Fax   (+82)02-3016-9019
닫기

이메일무단수집거부

본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나 그 밖의 기술적 장치를 통하여 무단으로 수집되는 것을 거부하며, 이를 위반 시 해당 무단 수집 자는 정보통신망 이용 촉진 및 정보보호에 관한 법률 기타 관계 법령에 의해 형사 처벌됨을 유념하시기 바랍니다.